Infraspeed Slab Movement
发布时间:2018-11-23 浏览次数:550 来源:欧美大地

High speed railway tracks are installed on approximately 6 m long concrete slabs. The sensors are installed on the joints between two slabs.

 

Aim of monitoring:

The main aim of the project is to monitor relative movement between concrete railway slabs. Measurement in the lateral and vertical directions are periodically performed with a required accuracy in both directions of 0.05 mm.

INSTALLATION PERIOD TYPE OF SENSORS NUMBER OF SENSORS
2006 – 2007 MuST 134
 

 